Try production planning and scheduling software tailored for consumer packaged goods manufacturing

Siemens offers a free trial of Opcenter Advanced Planning and Scheduling for Consumer Packaged Goods, or CP&G, designed to help manufacturers create more realistic production plans while balancing demand, capacity, materials, priorities and manufacturing constraints.

Unlike the general Opcenter Scheduling Standard trial, this evaluation is specifically positioned around the production problems faced by consumer packaged goods manufacturers.

Production planner using advanced planning and scheduling software in a consumer packaged goods manufacturing facility

That includes industries such as food and beverage, household products, personal care and other manufacturers where production planning must account for changing demand, packaging variations, ingredients, changeovers, cleaning requirements and short production runs.

Siemens describes the trial as an opportunity to experience an APS solution tailored specifically for consumer packaged goods and to create production schedules intended to maximize throughput based on priorities and production rules.

What Is Opcenter Advanced Planning and Scheduling?

Opcenter Advanced Planning and Scheduling, usually shortened to Opcenter APS, is Siemens’ software family for production planning and detailed manufacturing scheduling.

APS software attempts to answer two related questions:

What should we make, where and when?

and

In what sequence should we actually produce it?

Siemens divides APS into two major areas:

  • Advanced planning, which looks farther ahead and balances demand against available capacity.
  • Advanced scheduling, which creates more detailed production sequences based on machines, materials, labor, tooling and other constraints.

For CP&G manufacturers, those two activities are tightly connected.

Knowing that you need 50,000 cases of a product next month is only the beginning.

You also need to determine how to produce them without creating unnecessary downtime, excess inventory, material shortages or an endless series of costly product changeovers.

In Plain English: What Problem Does This Trial Solve?

Imagine a beverage manufacturer produces several flavors of juice in multiple bottle sizes.

Demand for one flavor suddenly increases.

Another product is running low on packaging.

A cleaning cycle has to occur before switching between certain products.

One filling line can handle both bottle sizes, while another cannot.

A retailer adds a rush order.

Meanwhile, production still has to meet next week’s normal orders.

A spreadsheet can list all of those orders.

The harder question is:

What should the factory make first, on which line, in what quantity and in what sequence?

That is the kind of problem Opcenter APS is designed to solve.

Why Is CP&G Scheduling Different?

Consumer packaged goods manufacturing often looks repetitive from the outside.

Factories may produce thousands or millions of units of similar products.

But planning those products can be surprisingly complicated.

CP&G manufacturers may have to account for:

  • Rapidly changing consumer demand
  • Seasonal demand
  • Promotions
  • Multiple package sizes
  • Multiple product variants
  • Shorter production runs
  • More frequent changeovers
  • Ingredient and material availability
  • Allergen restrictions
  • Cleaning requirements
  • Shelf-life constraints
  • Packaging availability
  • Production-line capabilities
  • Laboratory and quality requirements

Siemens specifically identifies several of these challenges in its Opcenter APS material for consumer packaged goods manufacturers, including balancing demand, supply and capacity, coordinating primary and secondary packaging, managing seasonal demand, reducing changeovers and clean-in-place operations, and handling allergen constraints.

What Does Advanced Planning Do?

Advanced planning looks beyond today’s detailed shop-floor schedule.

It helps manufacturers determine whether expected production demand can realistically be met using available capacity.

Planning questions might include:

  • How much should we manufacture?
  • Which facility should produce it?
  • Do we have enough capacity?
  • Will we need overtime?
  • Do we need additional shifts?
  • Are materials available?
  • Will demand exceed our production capability?
  • Should production be moved to another line or plant?

Siemens says Opcenter Planning considers forecasts and longer-term orders and supports feasibility decisions affecting the general direction of production.

Planning can operate across days, weeks or months and can use either finite or infinite capacity models depending on the analysis required.

What Does Advanced Scheduling Do?

Scheduling works at a more detailed level.

Once you know what needs to be produced, scheduling determines the sequence in which production should occur.

Opcenter Scheduling can account for factors such as:

  • Resource availability
  • Production priorities
  • Materials
  • Tooling
  • Operation run speeds
  • Changeover times
  • Production constraints
  • Order due dates

The software can rank or weight orders, model multiple constraints and optimize schedules around objectives such as reducing changeovers or following preferred production sequences.

For a CP&G manufacturer, that can make the difference between an apparently feasible production plan and one that can actually be executed efficiently.

Planning vs. Scheduling for CP&G

A simple way to distinguish the two is:

Planning:
Can we produce everything the business expects us to make?

Scheduling:
What exact sequence should the factory use to make it?

Suppose a manufacturer expects to sell 100,000 units of three products next month.

Planning determines whether the company has enough capacity, labor and materials to meet that demand.

Scheduling might then determine:

Run Product A first, followed by Product C, then Product B, because that sequence minimizes cleaning and changeover time.

Both decisions matter.

Why Changeovers Matter So Much in Consumer Packaged Goods

Changing from one product to another often consumes production time.

A changeover might require:

  • Cleaning equipment
  • Changing packaging materials
  • Adjusting production settings
  • Swapping labels
  • Changing ingredients
  • Reconfiguring equipment
  • Performing quality checks

If scheduling software ignores those costs, a schedule may look efficient while actually creating excessive downtime.

Siemens specifically identifies reducing setup and changeover time as one of the benefits of Opcenter APS.

For CP&G manufacturers, production sequence can therefore matter almost as much as production quantity.

Clean-in-Place Scheduling

Food, beverage and other process-oriented consumer products may require Clean-in-Place, or CIP, operations.

CIP cleans production equipment without completely dismantling it.

Cleaning may be required:

  • At scheduled intervals
  • Between incompatible products
  • Between allergen and non-allergen production
  • After certain production runs

Cleaning keeps production safe, but it also takes equipment out of service.

Siemens specifically identifies minimizing unnecessary CIP operations as an important CP&G planning and scheduling challenge.

An APS system can therefore help manufacturers build cleaning requirements into the production sequence rather than treating them as unexpected downtime.

Allergen Management Can Become a Scheduling Constraint

Allergen control creates another unusual scheduling problem.

A food manufacturer may need to carefully sequence products containing:

  • Nuts
  • Dairy
  • Gluten
  • Soy
  • Eggs
  • Other allergens

Running one product before another may require additional cleaning.

In some cases, changing the production sequence can reduce the number of cleaning operations required.

Siemens specifically identifies allergen management as a constraint that can require sequence optimization in CP&G production.

That illustrates why production scheduling is more complicated than simply arranging orders by due date.

Coordinate Primary and Secondary Packaging

Another CP&G challenge is coordinating production with packaging.

The product itself may be manufactured in one stage, while bottles, cartons, labels or other packaging are applied later.

A manufacturer may therefore need to coordinate:

Primary production

with

secondary packaging.

Siemens identifies coordination between primary and secondary scheduling as one of the challenges CP&G manufacturers face.

If those activities become disconnected, manufacturers can create unnecessary work-in-progress or run out of the packaging needed to complete an order.

Make-to-Stock vs. Make-to-Order

Consumer packaged goods manufacturers often use make-to-stock production.

Products are manufactured based on forecasts and placed into inventory before the final customer order arrives.

But some manufacturing environments also include make-to-order products or special customer requirements.

Opcenter APS supports both make-to-stock and make-to-order planning approaches.

That gives planners greater flexibility when a manufacturer has a combination of predictable high-volume products and less predictable customer-specific demand.

What-If Planning

One of the most useful APS capabilities is the ability to test alternatives before changing the production plan.

Suppose demand suddenly increases.

A planner might ask:

  • What happens if we add overtime?
  • What happens if we open another production line?
  • What happens if an order is moved forward?
  • What happens if material arrives late?
  • What happens if a machine goes down?
  • What happens if we increase batch size?

Instead of manually rebuilding a spreadsheet, APS software can help compare different production scenarios.

Siemens identifies what-if modeling and rapid response to changing demand as important APS benefits for consumer products manufacturers.

Respond to Seasonal Demand

Consumer products frequently experience large swings in demand.

That might be caused by:

  • Holidays
  • Weather
  • Promotions
  • Back-to-school periods
  • Retail events
  • New product launches
  • Seasonal consumption patterns

Siemens identifies seasonal demand as one of the factors CP&G manufacturers need to consider when adjusting master production schedules and capacity.

APS software gives planners a way to examine whether existing production resources can meet a temporary demand increase before orders begin piling up.

What Is a Master Production Schedule?

A Master Production Schedule, or MPS, defines what finished products a manufacturer expects to produce and when.

It operates at a higher level than the minute-by-minute or hour-by-hour detailed factory schedule.

Opcenter APS supports master production schedule creation and capacity planning.

For CP&G manufacturers, the MPS helps translate sales forecasts and expected demand into a realistic manufacturing plan.

That might determine:

Produce 100,000 cases of Product A next week.

Detailed scheduling then determines how those 100,000 cases should actually move through production.

Why Not Just Use ERP for Production Planning?

ERP systems are excellent at managing business information such as:

  • Orders
  • Inventory
  • Purchasing
  • Financial data
  • Material requirements

But detailed factory scheduling can require a more sophisticated model of production constraints.

An ERP system may know that an order is due Friday.

APS needs to consider whether the factory can realistically complete that order before Friday given:

  • Existing workload
  • Production capacity
  • Machine availability
  • Changeovers
  • Materials
  • Cleaning
  • Labor
  • Other orders competing for the same resources

Opcenter APS can operate as a standalone planning and scheduling system or integrate with ERP, MES and other manufacturing applications.

Who Should Try Opcenter APS for CP&G?

This trial may be particularly useful for:

  • Food manufacturers
  • Beverage manufacturers
  • Consumer product manufacturers
  • Household product manufacturers
  • Personal-care manufacturers
  • Packaging-intensive production environments
  • High-volume manufacturers with frequent changeovers

Potential evaluators include:

  • Production planners
  • Master schedulers
  • Supply chain planners
  • Operations managers
  • Plant managers
  • Production managers
  • Manufacturing engineers
  • Supply chain managers

It may be especially useful for organizations that have outgrown spreadsheet-based scheduling or find that ERP-generated plans do not reflect actual production constraints.

What Should You Evaluate During the Trial?

Do not simply generate one successful schedule.

Make the schedule uncomfortable.

Increase Demand

Add more production demand.

Can the software show where capacity becomes constrained?

Add a Rush Order

Move an important customer order forward.

Can you see what other orders will be affected?

Create a Material Shortage

See whether the schedule recognizes that production cannot proceed without the required materials.

Increase Changeover Time

Determine how sensitive throughput is to product sequencing.

Add a Cleaning Constraint

If your production requires cleaning between products, examine how those requirements change the production sequence.

Remove a Production Resource

Take a line or machine offline.

How quickly can you determine the impact?

Change Production Priorities

Does the resulting sequence make operational sense?

Compare Alternatives

Try more than one scenario.

The point of APS is not simply producing a schedule.

It is helping planners understand the consequences of different choices.

What the Trial May Not Tell You

A preconfigured APS trial can demonstrate planning and scheduling principles extremely well.

It cannot automatically prove that the software can reproduce your real manufacturing environment.

A real CP&G implementation may need accurate information about:

  • Demand forecasts
  • Product families
  • Bills of material
  • Recipes or formulas
  • Production rates
  • Line capabilities
  • Changeover rules
  • Cleaning requirements
  • Allergen restrictions
  • Packaging resources
  • Material availability
  • Labor
  • Production calendars
  • ERP data
  • MES data

The harder your production environment is to describe, the more important implementation and data modeling become.

Before purchasing, manufacturers should therefore ask:

Can Opcenter APS accurately represent the constraints that actually determine our production schedule?

That matters more than whether the demonstration data produces an attractive Gantt chart.

Opcenter Advanced Planning and Scheduling for CP&G Trial at a Glance

SoftwareSiemens Opcenter Advanced Planning and Scheduling
Trial positioningAdvanced Planning and Scheduling for CP&G
CategoryAdvanced Planning and Scheduling (APS)
Industry focusConsumer Packaged Goods
Primary purposeProduction planning and detailed scheduling
Demand/capacity balancingYes
Master production schedulingYes
Finite-capacity planningSupported
Detailed production schedulingYes
Changeover optimizationYes
Material constraintsYes
What-if analysisYes
ERP/MES integrationSupported
Best suited forCP&G manufacturers with complex capacity, sequencing and changeover requirements

Try Opcenter Advanced Planning and Scheduling for CP&G

The Opcenter APS for CP&G trial addresses a manufacturing problem that can become deceptively complicated.

A consumer packaged goods factory may produce familiar products every day, but small changes in demand, packaging, materials or production sequence can create large differences in output.

The objective of APS is not simply to put orders on a calendar.

It is to determine whether those orders can actually be produced — and then find a practical sequence for producing them efficiently.

During the trial, start with a production plan and then deliberately disrupt it.

Change demand.

Delay material.

Add a rush order.

Take away capacity.

Introduce another changeover.

Then ask:

How quickly can we create a realistic alternative?

For manufacturers that still rebuild production schedules manually whenever conditions change, that may be the most revealing test of all.

Start the Siemens Advanced Planning and Scheduling for CP&G trial