What Is HALT and HASS? How Engineers Find Weaknesses Before Customers Do

Imagine you have designed a new electronic product.

It works.

It passed its normal functional tests.

It operates correctly at the temperatures listed in the specification.

Electronic product undergoing HALT reliability testing with temperature and vibration stresses

It survived the vibration level it is expected to experience in service.

Everyone is feeling pretty good.

Then somebody from reliability engineering says:

Excellent. Now let’s make it hotter.

Then colder.

Then shake it harder.

Then cycle between hot and cold faster.

Then combine temperature and vibration.

And keep going until something fails.

That may sound less like engineering and more like hostility toward the product.

But there is a very specific reason for it.

The engineers are not necessarily trying to prove the product meets its requirements.

They are trying to discover where its weaknesses are hiding.

That is the idea behind:

HALT โ€” Highly Accelerated Life Testing

and its production partner:

HASS โ€” Highly Accelerated Stress Screening.

They are related.

But they are not the same thing.

And understanding the difference tells you a great deal about how companies try to find failures before their customers do.


What Is HALT?

HALT stands for:

Highly Accelerated Life Test or, commonly, Highly Accelerated Life Testing.

Despite the name, HALT is not simply a faster version of ordinary life testing.

Its purpose is to deliberately expose a product to increasing levels of stress so engineers can uncover weaknesses, identify operating margins and discover failure mechanisms.

Typical HALT stresses can include:

  • high temperature
  • low temperature
  • rapid temperature changes
  • vibration
  • repetitive shock vibration
  • combinations of temperature and vibration
  • other product-specific stresses

The stresses are intentionally taken beyond the product’s expected normal operating environment.

That is one of the most important things to understand about HALT.

Engineers are not asking:

Does the product survive the environment in the specification?

They are asking:

How much farther can we go before something starts going wrong?

ESPEC describes HALT as a step-stress process that subjects a unit under test to thermal and vibration levels beyond what it would normally experience, specifically so weaknesses and failure modes can be found and corrected quickly.


HALT Is Not a Pass/Fail Qualification Test

This distinction matters enormously.

Suppose the product requirement says:

Operate from -20ยฐC to 60ยฐC.

A conventional verification test may evaluate whether the product functions throughout that specified range.

If it does:

PASS.

If it doesn’t:

FAIL.

HALT approaches the problem differently.

The engineer might begin somewhere within the normal operating range and then continue lowering the temperature in steps.

Perhaps the product works at:

-20ยฐC.

Then -30ยฐC.

Then -40ยฐC.

Then at -47ยฐC a display stops responding.

The HALT engineer does not necessarily declare:

The product failed qualification!

Why?

Because the product may never be required to operate at -47ยฐC.

Instead, the engineer has discovered something potentially more useful:

We now know where the lower-temperature operating margin begins to disappear.

HALT deliberately goes searching for those limits.

ESPEC makes this distinction explicit: conventional Design Verification Testing verifies that a product meets specification, while HALT deliberately stresses the product beyond specification and is considered successful when weaknesses are discovered and eliminated.

That may sound upside down at first.

In HALT:

Finding a failure can be good news.

Because finding it in the laboratory gives engineers a chance to understand and improve it before the customer ever sees it.


The Goal Is Not Destruction for Destruction’s Sake

HALT has acquired a reputation as:

Test it until it breaks.

That is not entirely wrong.

But it is incomplete.

An engineer does not gain much from destroying a product randomly.

The useful part is learning:

  • when performance begins to degrade
  • what component causes the degradation
  • whether the failure is reversible
  • what stress produced it
  • whether the weakness matters in real-world use
  • whether design margin can be improved
  • whether another hidden weakness appears after the first one is corrected

HALT is structured exploration.

Stress is applied deliberately.

The product is monitored.

Engineers record where abnormal behavior begins.

Then they investigate.

The objective is not:

How spectacularly can we kill this prototype?

It is:

What is the weakest part of this design, and what happens if we strengthen it?


Step Stressing: Turn the Knob a Little Further

HALT frequently uses a step-stress approach.

Suppose engineers are investigating high-temperature performance.

They might operate the product at:

50ยฐC.

Then 60ยฐC.

Then 70ยฐC.

Then 80ยฐC.

At each step, they allow the product to stabilize and perform functional testing.

If it keeps working, the temperature increases again.

Eventually something changes.

Perhaps:

  • a processor begins resetting
  • a sensor drifts
  • a display becomes unreadable
  • a power supply shuts down
  • communication becomes unreliable
  • an adhesive softens
  • a connector loses contact

Now the engineering team has found a boundary worth investigating.

The same concept can be used at low temperatures or with increasing vibration.

HALT gradually pushes the product into uncomfortable territory while engineers watch closely.


What Is an Operating Limit?

During HALT, engineers may identify an operating limit.

This is the stress level where the product stops functioning correctly but may recover once the stress is reduced.

Imagine an electronic controller stops operating at -55ยฐC.

The engineer increases the temperature to -45ยฐC.

The controller begins working again.

That may be considered a soft failure rather than permanent damage.

It tells engineers something important about the operating margin.

The product did not necessarily break permanently.

It reached an environmental condition under which it could no longer function.

HALT terminology may distinguish limits such as:

  • Upper Operating Limit
  • Lower Operating Limit
  • Vibration Operational Limit

These limits are not necessarily product specifications.

They are information about how much margin the design actually possesses.


Then Engineers May Keep Going

This is where HALT gets meaner.

Suppose the product stopped operating at -55ยฐC but recovered.

Engineers may not stop.

They may reduce the temperature further.

At some point, a component may suffer permanent damage.

Now returning to normal conditions does not restore functionality.

That may identify a destruct limit.

HALT programs may therefore identify both:

Operating limits โ€” where function is temporarily lost.

and

Destruct limits โ€” where permanent damage occurs.

ESPEC’s HALT terminology specifically distinguishes operating limits and destruct limits for temperature and vibration.

That gives engineers a map.

Not simply:

It passed.

But:

Here is the region where it operates normally. Here is where performance becomes marginal. And here is where actual damage begins.

That is much richer engineering information.


Why Do Engineers Care About Margin?

Suppose a product is required to operate up to 60ยฐC.

Product A stops functioning at 62ยฐC.

Product B continues operating until 95ยฐC.

Both may technically satisfy the requirement.

But would you consider the designs equally robust?

Probably not.

Product A has very little margin.

Manufacturing variation, component aging or slightly unusual field conditions might easily push some units over the boundary.

Product B has substantially more headroom.

HALT helps engineers see that difference.

This is why HALT is sometimes associated with product ruggedization.

The objective is not merely to satisfy the line written in the specification.

It is to uncover weak design margins that could later become reliability problems.


Manufacturing Variation Changes Everything

Now imagine Product A is manufactured 100,000 times.

Not every resistor is identical.

Not every solder joint is identical.

Not every component comes from exactly the same production batch.

Not every mechanical dimension lands exactly at nominal.

Real production contains variation.

That means a design barely surviving its requirements on one carefully assembled engineering prototype may perform differently once manufactured at scale.

HALT gives engineers an opportunity to find marginal design areas where normal manufacturing variation could become dangerous.

If a design has generous margin, small variations may not matter.

If the design lives right at the edge, they might.


Temperature Alone May Not Find the Problem

Real failures often emerge from combinations of stresses.

Perhaps the product survives high temperature.

It also survives vibration.

Wonderful.

Now apply high temperature and vibration simultaneously.

Something fails.

Why?

Because mechanical and thermal stresses can interact.

Temperature changes may alter:

  • material stiffness
  • solder behavior
  • connector fit
  • gasket compression
  • electrical resistance
  • component performance

At the same time, vibration applies mechanical loading.

One stress can expose a weakness that makes another stress more damaging.

HALT chambers are often designed specifically to apply rapid temperature changes and repetitive-shock vibration individually or together.

And this is another recurring lesson in Verification & Test:

A product does not experience the real world one stress at a time just because the test plan is easier that way.


What Is Rapid Thermal Cycling?

Traditional temperature testing may change conditions relatively slowly.

HALT can use very rapid thermal transitions.

Why?

Fast temperature changes can create mechanical stresses because materials do not all expand or contract at the same rate.

Imagine a printed circuit board containing:

  • copper
  • solder
  • silicon
  • plastic
  • ceramic
  • aluminum
  • adhesives

Each material responds differently to temperature.

Rapid changes can expose weaknesses in:

  • solder joints
  • connectors
  • component leads
  • adhesives
  • seals
  • mechanical joints

A product might tolerate a steady -30ยฐC.

It might tolerate a steady 70ยฐC.

Rapidly transitioning between those conditions can reveal an entirely different weakness.


And Then There Is Vibration

HALT vibration testing can also be aggressive.

Rather than reproducing one precise real-world vibration profile, the purpose is often to excite the product broadly enough to uncover mechanical weaknesses.

Potential failures include:

  • loose connectors
  • marginal solder joints
  • cracked components
  • fatigued wires
  • inadequate fasteners
  • poor mechanical supports
  • printed circuit board flex
  • resonance problems

As the vibration level increases, engineers continue performing functional tests.

The goal is to find where the design becomes vulnerable.

And then, ideally, figure out why.


Finding the First Weakness Is Not the End

This is one of the most interesting aspects of HALT.

Suppose engineers find that a connector repeatedly fails during vibration.

They redesign the mount.

Now the connector survives.

Excellent.

Run HALT again.

This time something else fails.

Maybe a circuit board mounting point cracks.

Fix that.

Test again.

Now a solder joint becomes the weak point.

HALT can become a process of uncovering successive layers of vulnerability.

Think of it this way:

Every product has a weakest link.

Strengthen it, and something else becomes the weakest link.

The process can continue until engineers decide the product has sufficient margin for its intended use.

This is why the objective is sometimes described as ruggedizing the design.


So What Is HASS?

This is where the alphabet gets confusing.

HALT is primarily aimed at finding design weaknesses.

HASS is primarily aimed at finding manufacturing weaknesses.

HASS stands for:

Highly Accelerated Stress Screen or Highly Accelerated Stress Screening.

Once a product has been developed and its margins better understood through HALT, a company can use that knowledge to create a production screening process.

The purpose is not to discover that the basic design is bad.

Ideally, HALT already addressed that.

HASS asks:

Did something go wrong while we were manufacturing this particular unit?

ESPEC describes HASS as a production screen using accelerated techniques derived from HALT but at reduced stress levels, intended to expose production defects and deviations before units reach customers.


HALT Finds Design Problems. HASS Finds Production Problems.

That is the easiest distinction to remember.

HALT

What weaknesses are built into the design?

HASS

What weaknesses crept into production?

Consider a product whose design has already been ruggedized.

Then manufacturing begins.

Problems can still appear.

A supplier changes a component.

A soldering process drifts.

A fastener is under-torqued.

A connector is installed poorly.

An adhesive application changes.

A circuit board has a manufacturing defect.

A wire is pinched during assembly.

These are not necessarily design problems.

They are production variation problems.

HASS attempts to expose units containing those latent weaknesses before they leave the factory.


Think of HALT as the Detective and HASS as the Bouncer

HALT goes looking for weaknesses in the design.

It asks questions.

It pushes limits.

It investigates.

It finds the trouble.

Then engineers use that knowledge to improve the product.

HASS stands closer to the production door.

Its job is:

Do not let a marginal unit leave the building.

The analogy is not perfect.

But it makes the distinction memorable.


HASS Should Not Destroy Good Products

This is critically important.

HALT may deliberately push prototypes toward operating and destruct limits.

HASS is applied to production units.

Those are products the company wants to sell.

Destroying all of them would make for a very reliable but economically questionable business model.

Therefore the HASS stresses have to be severe enough to expose manufacturing weaknesses while remaining safely inside the product’s established capability.

ESPEC describes HASS as using stresses more severe than normal product specification but within the design capability discovered through HALT.

That is why developing the HASS profile correctly matters so much.

Too gentle?

Weak units escape.

Too aggressive?

The screen itself may damage perfectly good products.

Neither outcome is desirable.


HALT Usually Comes First

Because HALT helps establish the product’s margins and weaknesses, it provides valuable information for creating a safe HASS profile.

Engineers need to understand where the product’s operational and destruct limits are before deciding how aggressively production units can be screened.

This is one reason HALT and HASS are usually discussed together.

HALT learns about the design.

HASS uses what was learned.

For new products, HALT therefore generally precedes HASS development.


What Does HASS Look For?

HASS is particularly interested in latent defects.

These are defects already present in the product but not obvious during ordinary functional testing.

Imagine a solder joint that is barely connected.

The product powers on.

It passes a simple factory test.

Ship it.

A month later, normal vibration causes the connection to fail.

The customer sees a dead product.

A sufficiently effective stress screen might have forced that marginal joint to reveal itself before shipment.

Other examples could include:

  • marginal connectors
  • weak solder joints
  • loose hardware
  • cracked components
  • manufacturing contamination
  • component substitutions
  • assembly errors
  • process drift
  • wiring defects

The goal is not simply to catch broken products.

Ordinary functional testing can often do that.

HASS is trying to expose products that are almost broken but do not know it yet.


The Phrase Engineers Hate: โ€œNo Fault Foundโ€

Reliability problems can be particularly frustrating when a customer reports a failure but the returned product works perfectly when it reaches the laboratory.

This can produce labels such as:

No Fault Found

No Trouble Found

No Defect Found

Intermittent failures are notoriously difficult.

A marginal solder joint may reconnect.

A connector may behave differently after transportation.

Temperature may have affected the problem.

Vibration may have triggered it.

This is another reason accelerated stress techniques can be valuable.

Engineers want marginal conditions to reveal themselves under controlled circumstances rather than randomly in customers’ hands.


Why Not Just Use Burn-In?

Traditional burn-in testing generally operates products for a period of time, often at elevated temperature, to encourage early-life defects to appear.

Burn-in can still be useful.

But HASS takes a broader and typically more aggressive approach by applying stresses such as rapid temperature changes and vibration.

ESPEC distinguishes HASS from traditional ESS and burn-in because HASS is specifically designed to expose latent production weaknesses quickly using accelerated stresses.

The broader idea is similar:

If this unit is going to fail early, we would rather make it fail here than at the customer’s site.


HASS Is Not HAST

Here is an acronym trap worth avoiding.

HASS and HAST are different things.

HASS:

Highly Accelerated Stress Screening

is associated with accelerated production screening.

HAST:

Highly Accelerated Stress Test

is commonly used in semiconductor and electronics reliability testing involving high temperature, humidity and pressure to accelerate moisture-related failure mechanisms.

Those extra letters may look almost identical when you are scanning a document.

They are not interchangeable.

Verification & Test apparently decided engineering needed both brutal testing and spelling traps.


Why Accelerated Testing Works

Many reliability problems take time to appear under normal conditions.

Maybe a weak joint survives thousands of ordinary cycles before failing.

Maybe thermal expansion slowly damages something.

Maybe vibration eventually loosens a marginal connection.

Waiting years to discover whether the design contains those weaknesses is not especially practical.

Accelerated testing increases stress to make weaknesses reveal themselves sooner.

But there is an important catch.

The accelerated stress has to expose relevant failure mechanisms.

If engineers create failure modes that could never reasonably occur in real life, they may spend time fixing irrelevant problems.

This is where expertise matters.

The goal is not simply:

More stress must be better.

The goal is:

Use stress intelligently to reveal meaningful weaknesses faster.


Can HALT Predict Product Life?

This is another important misconception.

HALT is not normally used to say:

This product will last exactly 14.7 years.

Because HALT intentionally applies stresses beyond normal use and does not necessarily establish a statistical relationship between test duration and field life.

That makes it different from some formal accelerated life-testing techniques that attempt to model failure rates or lifetime using defined acceleration relationships.

HALT is primarily a discovery and ruggedization tool.

It helps engineers find:

  • weak margins
  • failure modes
  • operating limits
  • destruct limits

It does not automatically translate those observations into an exact service-life prediction.

The word Life in HALT can therefore be slightly misleading if interpreted too literally.


HALT vs. Traditional Verification Testing

The distinction is important enough to put side by side.

Traditional Verification TestHALT
Tests against requirementsTests beyond requirements
Usually has defined pass/fail criteriaSearches for limits and weaknesses
Confirms specified performanceDiscovers design margin
Often uses expected environmental conditionsUses increasingly severe stress
Passing is normally the objectiveFinding meaningful failures can be success
Evidence supports requirement complianceEvidence helps improve robustness

The two approaches are complementary.

HALT does not replace qualification or verification testing.

A product can survive HALT impressively and still require formal verification against regulatory, contractual or industry requirements.

Likewise, a product can pass every required qualification test and still contain uncomfortable design margins HALT might expose.

They answer different questions.


HALT Is Not About Proving the Product Is Indestructible

No product is indestructible.

Increase the temperature enough and eventually something fails.

Increase vibration enough and eventually something breaks.

Continue applying stress and physics will win.

HALT is not trying to prove otherwise.

The meaningful questions are:

Where does failure occur?

What fails first?

Does the margin seem adequate?

Is the failure mechanism relevant?

Can the design be improved economically?

At some point engineers stop.

Not because they have created an immortal product.

Because they have learned enough to judge the design appropriately robust for its purpose.


What Kinds of Products Use HALT and HASS?

HALT and HASS are especially associated with electronics and electromechanical products, but the concepts can apply broadly.

Examples include:

  • automotive electronics
  • aerospace systems
  • telecommunications equipment
  • industrial controls
  • medical electronics
  • power electronics
  • defense equipment
  • consumer electronics
  • networking equipment
  • sensors
  • embedded systems
  • electromechanical assemblies

Any product where reliability matters and environmental stresses can expose weaknesses may be a candidate.

The financial value becomes particularly obvious when failures are expensive.

Replacing a consumer gadget is annoying.

Replacing electronics installed:

inside an aircraft,

on offshore equipment,

inside industrial machinery,

or in a remote telecommunications installation

can cost vastly more than the failed component itself.

Sometimes the truck roll costs more than the electronics.


HALT Can Reveal Problems Engineers Never Expected

This is perhaps the most useful part of the methodology.

Engineers enter testing with assumptions.

The power supply will probably be temperature sensitive.

This connector may be vulnerable to vibration.

The display could struggle in the cold.

Then HALT reveals:

Nope. It was the $0.40 component nobody was worried about.

Testing has a way of humiliating assumptions.

A weakness might come from:

  • an unexpected resonance
  • a marginal commercial component
  • a solder joint
  • a connector
  • an adhesive
  • cable routing
  • inadequate cooling
  • tolerance stack-up
  • board layout
  • mechanical mounting

That is exactly why physical testing remains so valuable even when simulation is excellent.

The model only includes what engineers knew enough to model.

Reality includes everything.


The Product Failed. What Happens Next?

Suppose HALT exposes a failure.

The process should not end with:

Well, that broke.

Now comes failure analysis.

Engineers may investigate:

  • electrical measurements
  • thermal data
  • vibration response
  • physical damage
  • solder joints
  • connectors
  • circuit boards
  • material behavior
  • software logs
  • high-speed measurements

The team then tries to determine the root cause.

Maybe the design changes.

Maybe a different component is selected.

Maybe a mount is reinforced.

Maybe cooling improves.

Maybe firmware behavior changes.

Then:

Test it again.

This cycle is where much of the reliability improvement actually occurs.

Stress โ†’ Failure โ†’ Root Cause โ†’ Fix โ†’ Retest

A HALT chamber alone does not improve a product.

The engineering response to what the chamber reveals does.


How HASS Can Become a Manufacturing Alarm System

Once production begins, HASS can do more than identify individual defective units.

Changes in HASS failures can reveal something changing in the manufacturing system.

Suppose failure rates suddenly increase.

Why?

Maybe:

  • a new supplier entered the chain
  • component quality shifted
  • soldering parameters drifted
  • an assembly process changed
  • tooling wore out
  • a substitute material was introduced

The HASS result can become an early warning signal.

The engineer does not simply remove the failed product.

The more important question is:

Why are these units suddenly failing the screen?

That can reveal a process problem before it becomes a widespread field problem.


But Screening Quality Into a Bad Design Does Not Work

HASS is not magic.

Suppose the original design is fundamentally marginal.

You cannot solve that problem simply by screening production harder.

You might catch bad units.

But you have not fixed the underlying design.

This is why the HALT/HASS sequence makes sense:

First improve the design.

Then:

Monitor production so manufacturing variation does not undermine it.

Trying to compensate for a weak design with aggressive production screening can become expensive and ineffective.


Too Much HASS Can Create Its Own Problems

There is another danger.

If a production stress screen is too severe, it may consume some of the useful life of good products or create damage that would not otherwise have occurred.

The screen itself becomes the problem.

That means HASS development is an engineering task.

The stress level needs to be:

high enough to reveal meaningful manufacturing defects,

but

low enough to avoid damaging healthy products.

That balance depends on understanding the margins discovered during HALT.


Why Customers Are the Worst Test Laboratory

Customers are extraordinarily talented at discovering product weaknesses.

They:

leave equipment in hot cars.

Use it in cold weather.

Drop it.

Vibrate it.

Plug things in incorrectly.

Operate it continuously.

Expose it to moisture.

Combine environmental conditions no engineering test plan anticipated.

Unfortunately, customer testing has several disadvantages.

It happens after launch.

It creates warranty claims.

It damages reputation.

It generates support calls.

It may involve safety.

And customers rarely provide beautifully instrumented failure data.

Their test report often says:

Stopped working.

This is why reliability engineers work so hard to move failure discovery earlier.

A failure discovered during HALT may be frustrating.

A failure discovered by 50,000 customers is much more exciting than anyone wanted.


Where HALT Fits in the Product Development Process

HALT is most valuable when there is still time to change the design.

That usually means using it during development rather than waiting until everything is frozen for production.

A simplified sequence might look like:

Design

โ†“

Prototype

โ†“

HALT

โ†“

Find Weaknesses

โ†“

Redesign

โ†“

Retest

โ†“

Formal Verification / Qualification

โ†“

Production

โ†“

HASS

That exact sequence varies by company and product.

But the principle matters.

The earlier engineers discover a weakness, the easier and less expensive it is usually to correct.


HALT and Simulation Are Excellent Partners

Simulation can help engineers predict:

  • temperature
  • structural response
  • vibration behavior
  • thermal expansion
  • fatigue
  • component loads

HALT provides physical evidence.

Suppose vibration testing reveals an unexpected resonance.

Engineers can return to the simulation model and investigate.

Perhaps the boundary conditions were wrong.

Maybe stiffness was misestimated.

Maybe a fastener was modeled too rigidly.

The updated model can then help evaluate potential fixes before another prototype is built.

This creates another useful development loop:

Simulation โ†’ HALT โ†’ Failure Data โ†’ Improved Model โ†’ Redesign โ†’ Retest

Physical testing does not mean simulation failed.

Often physical testing makes simulation better.


Do Engineers Actually Want HALT to Find Something?

Yes.

A HALT program where nothing ever fails may feel comforting.

It may also raise questions.

Was the product genuinely extremely robust?

Or did the engineers simply not push far enough to discover its margins?

Remember:

HALT is intended to learn.

ESPEC describes a successful HALT program in terms of discovering and eliminating failure modes rather than simply producing a clean pass result.

That creates a very different engineering culture around failure.

During qualification testing:

Failure is bad news.

During HALT:

Failure may be the thing you came to find.


What Should Engineers Evaluate During a HALT or HASS Program?

If you are evaluating HALT/HASS capabilities, test equipment or outside laboratories, consider more than the chamber specification.

Stress Capability

Can the system provide the:

  • temperature range
  • temperature transition rate
  • vibration capability
  • combined stresses

needed for the product?

Product Instrumentation

Can engineers monitor critical functions continuously during stress?

Functional Testing

A product sitting silently in a chamber tells you less than a product being actively monitored while it operates.

Vibration Measurement

Where are accelerometers placed?

What stress is actually reaching the product?

Thermal Measurement

What is the product temperature, not merely the air temperature in the chamber?

Fixture Design

Is vibration being transmitted realistically and consistently?

Failure Analysis

Can engineers investigate why the failure occurred?

Test Automation

Can stress levels, functional tests and data collection be coordinated automatically?

Repeatability

Can another unit be tested under comparable conditions?

Data Management

Are engineers capturing enough information to compare designs, units and production trends?

HASS Development

Has the production screen been derived from actual HALT information and validated so that good units are not being damaged?

Because HALT and HASS are not simply boxes you buy and put products inside.

They are engineering processes.


HALT and HASS in One Sentence

If you remember nothing else, remember this:

HALT tries to find weaknesses in the design. HASS tries to find weaknesses introduced during manufacturing.

Or, slightly less formally:

HALT asks, โ€œWhat did we design wrong?โ€

HASS asks, โ€œWhat did we build wrong?โ€

That distinction makes the alphabet soup much easier.


The Bottom Line

Engineers cannot eliminate every product failure.

But they can decide who gets the first opportunity to discover one.

Ideally, it is not the customer.

HALT deliberately pushes products beyond normal operating conditions to uncover weak margins, unexpected failure modes and vulnerable design decisions.

Engineers may:

heat the product,

freeze it,

rapidly cycle the temperature,

shake it,

combine stresses,

and keep pushing until weaknesses reveal themselves.

Then they investigate.

Redesign.

And test again.

Once production begins, HASS uses controlled accelerated stresses to expose marginal units and manufacturing problems before products leave the factory.

The philosophy behind both methods is remarkably simple:

If something is going to fail, find out here.

In the laboratory.

With instrumentation.

With engineers watching.

With the design files still available.

And preferably before a customer calls to tell you what broke.